Page 10 - 地质灾害治理及生态环境修复研究
P. 10
of earthquake induced geological disasters, and case analysis of human activities
exacerbating geological disasters; Chapter 3 introduces the geological hazard
control technology system, including engineering control technologies (anchoring,
retaining walls, drainage systems), biological control technologies (vegetation
slope protection, root system soil stabilization), application of intelligent
monitoring and early warning technologies, and environmental friendliness
evaluation of control projects; Chapter 4 introduces the theory and methods of
ecological environment restoration, including the core concepts and principles of
ecological restoration, soil remediation techniques (heavy metal pollution control,
organic matter restoration), water restoration techniques (wetland reconstruction,
microbial purification), vegetation restoration, and biodiversity conservation
strategies; Chapter 5 is about the collaborative governance of geological disasters
and ecological restoration, introducing the research on the natural recovery
capacity of post disaster ecosystems, the integrated design of engineering
governance and ecological restoration, and the economic and sustainable
analysis of comprehensive governance models; Chapter 6 is about geological
hazard monitoring, early warning, and information technology. It introduces the
application of remote sensing and GIS technology in geological hazard monitoring,
the dynamic early warning system driven by the Internet of Things and big data,
and the innovative practice of artificial intelligence in disaster risk assessment;
Chapter 7 introduces policies, regulations, and management mechanisms,
including a comparison of domestic and international geological disaster
prevention and control policy systems, regulatory standards and responsibility
allocation for ecological restoration, collaborative management mechanisms
among government, enterprises, and communities, and the importance of public
participation and environmental education; Chapter 8 is a typical case analysis
and practice, introducing the ecological restoration project after the Wenchuan
earthquake in China, the comprehensive management of landslide disasters in

